Parry Sound WWTP, Phase 3 Parry Sound, ON
Upgrades performed to the Parry Sound Waste Water Treatment Plant during 2011.
Work included the installation of a 750 kW Cummins Diesel Generator as well as a revamp of the instrumentation inside the plant.